How Does the Overseas Assembly Process Work?
06.09.2025

How Does the Overseas Assembly Process Work?

Rack systems are structures that gain value not only through product supply, but also through proper installation and implementation. Especially in international projects, the installation process requires professional planning and implementation in accordance with international standards. So, how does the international installation process work? Here's a step-by-step process:

1. Project Analysis and Preparation

International installation projects begin with a detailed technical analysis. Storage space, product types, and operational needs are evaluated. At this stage:

  • The shelving system design and technical drawings are prepared.
  • Load handling calculations are made.
  • The production process for material procurement is planned.

2. Logistics and Shipping

Logistics is one of the most critical stages of international projects. Shelving systems are packaged according to the shipping plan and shipped in accordance with international transportation standards. During this process:

  • Materials are packaged to prevent damage.
  • Customs procedures and documentation preparations are completed.
  • Delivery times are determined to align with the project schedule.

3. Professional Installation Team

The installation phase is the most critical part of the job. Experienced installation teams are employed on international projects. These teams have the experience to adapt to different country conditions and field challenges. During the installation process:

  • Installation is carried out in accordance with international safety standards.
  • Quick solutions are provided for temporary on-site problems.
  • The racking system is fully completed in accordance with the project.

4. Testing and Commissioning

After installation is complete, the system's safety and functionality are checked. Loading tests are performed, and the racking capacity is checked. If necessary, user training is provided before the system is commissioned.

5. After-Sales Support

Overseas installation projects don't end with installation. In the after-sales process:

  • Technical support is provided.
  • Spare parts are supplied.
  • Periodic maintenance recommendations are shared.

Results

The overseas assembly process is comprehensive, encompassing analysis, logistics, professional assembly, testing, and after-sales support. A properly managed overseas assembly project provides businesses with safe, durable, and long-lasting solutions. Racking systems provide benefits.

Atlas Racking Engineering, with our experience in international projects, we maintain the same quality standards in different countries and offer reliable solutions in every field.

Atlas Raf Mühendislik

Atlas Raf Mühendislik, 2020’den bu yana depo, market, arşiv ve endüstriyel alanlara mühendislik odaklı raf sistemleri, profesyonel montaj ve yurt dışı projeleriyle güvenli ve verimli çözümler sunmaktadır.

We are always here to offer you the most suitable solution!